ISO 9001 certificate
Quality management system certificate for Tuguan Semiconductor.
Request latest documentQuality Assurance
Our quality workflow helps align inspection documents, material traceability, and compliance declarations with each quotation or project scope.
Certifications
Quality Management System
Issued by: Accredited certification body
QMS-related documents can be requested for supplier qualification and project review.
Request latest documentSemiconductor Equipment & Materials
Issued by: SEMI International
Applicable semiconductor equipment expectations can be reviewed against the component drawing, material, and use case.
Request latest documentRestriction of Hazardous Substances
Issued by: EU Directive 2011/65/EU
RoHS declarations can be requested when relevant to the quotation or project scope.
Request latest documentChemical Safety Regulation
Issued by: European Chemicals Agency (ECHA)
REACH declarations can be requested when relevant to the quotation or project scope.
Request latest documentDocument Preview
Selected company qualification and quality documents are shown here for quick supplier review. Latest stamped versions can be requested for a quotation or project file.
Quality management system certificate for Tuguan Semiconductor.
Request latest document
Chinese quality management certificate copy for company qualification review.
Request latest document
External testing document used to support material and compliance review.
Request latest document
Supporting test record for customer quality documentation packages.
Request latest document
Company registration document for qualification and supplier review.
Request latest documentQuality Process
Incoming material documents and inspection needs are reviewed before production.
Operators use inspection tools according to the drawing and agreed control plan.
Critical-to-function dimensions, surface finish, cleanliness, and visual quality can be checked according to the agreed inspection scope.
Certificates, inspection reports, and dimensional data can be included when agreed before order placement.
Inspection Equipment
| Equipment | Brand / Model | Capability | Accuracy |
|---|---|---|---|
| Dimensional Inspection | Project-specific | CMM or calibrated gauges when required | Per inspection plan |
| Surface Roughness Review | Project-specific | Ra / Rz / Rq measurement when specified | Per agreed method |
| Profile Inspection | Project-specific | Contour / profile review | Per inspection plan |
| Material Composition Review | Supplier / lab scope | Supplier certificate or arranged analysis | Project-specific |
| Trace-Metal Analysis | Arranged when specified | ICP-OES / ICP-MS can be arranged when specified | Lab- and element-dependent |
| Leak Testing | Arranged when specified | Helium leak testing can be arranged for relevant assemblies | Project-specific criterion |